HV Cable Jointers
Apply Now
Contract
UK - United Kingdom
Offshore Wind
Reference no. 11851
HV Cable Jointers
Job Role
• Report directly to on shift Commissioning Lead Site Manager.
• Take technical direction from Electrical Safety Specialist where required.
• Work from COSV.
• HV cable pull, route and clipping - ad hoc.
• Connection of HV tower cable into junction box in tower (Pfisterer) - ad hoc.
• Termination of HV tower cable onto converter frame in nacelle - all WTG’s.
• Complete training in Employer E&MISR to become nominated as a Competent Person to receive a safety document - Permit-for-Work.
• Work under a Permit-for-Work and lead team and or be member of a work party under safety document.
• Removal of Array Cable HV jumper cables - Pfisterer Seaanex 3a. (RAMS will be provided).
• Complete pre-use checks and inspection of 6.2m PASMA scaffold tower.
• Work from 6.2m PASMA scaffold tower.
• Erect cable containment from WTG tower to foundation where required.
• Route, clip and connect into HV dropper cable (Pfisterer Seaanex 3a connectors - RAMS will be provided) from WTG switchgear into inner array cable joints foundation.
• Disassemble 6.2m PASMA tower and stow as per site management instruction.
• Any other WTG related work scopes requested by Commissioning Lead Site Manager.
• Participate in regular offshore rescue drills through the project
Qualifications
• Completed an electrical apprenticeship, preferably as a cable jointer or HV technician.
• Certified in NKT CB 72-150 & CC 72-1250 T-boot terminations.
• Certified in Pfisterer Seaanex Type 3a Plug in operations.
• PASMA Towers for Users (T).
• All basic GWO training a
• Wind Turbine Safety Rules - Core.
Job Role
• Report directly to on shift Commissioning Lead Site Manager.
• Take technical direction from Electrical Safety Specialist where required.
• Work from COSV.
• HV cable pull, route and clipping - ad hoc.
• Connection of HV tower cable into junction box in tower (Pfisterer) - ad hoc.
• Termination of HV tower cable onto converter frame in nacelle - all WTG’s.
• Complete training in Employer E&MISR to become nominated as a Competent Person to receive a safety document - Permit-for-Work.
• Work under a Permit-for-Work and lead team and or be member of a work party under safety document.
• Removal of Array Cable HV jumper cables - Pfisterer Seaanex 3a. (RAMS will be provided).
• Complete pre-use checks and inspection of 6.2m PASMA scaffold tower.
• Work from 6.2m PASMA scaffold tower.
• Erect cable containment from WTG tower to foundation where required.
• Route, clip and connect into HV dropper cable (Pfisterer Seaanex 3a connectors - RAMS will be provided) from WTG switchgear into inner array cable joints foundation.
• Disassemble 6.2m PASMA tower and stow as per site management instruction.
• Any other WTG related work scopes requested by Commissioning Lead Site Manager.
• Participate in regular offshore rescue drills through the project
Qualifications
• Completed an electrical apprenticeship, preferably as a cable jointer or HV technician.
• Certified in NKT CB 72-150 & CC 72-1250 T-boot terminations.
• Certified in Pfisterer Seaanex Type 3a Plug in operations.
• PASMA Towers for Users (T).
• All basic GWO training a
• Wind Turbine Safety Rules - Core.
Apply Now!
Similar Jobs
HSE Manager
Offshore Wind
Contract Manager
Offshore Wind
HV Electrical Engineer (Senior)
Offshore Wind