HV Cable Jointers
Apply Now
Back to Search
Contract
UK
Offshore Wind
Reference no. 11851
HV Cable Jointers
Job Role
• Report directly to on shift Commissioning Lead Site Manager.
• Take technical direction from Electrical Safety Specialist where required.
• Work from COSV.
• HV cable pull, route and clipping - ad hoc.
• Connection of HV tower cable into junction box in tower (Pfisterer) - ad hoc.
• Termination of HV tower cable onto converter frame in nacelle - all WTG’s.
• Complete training in Employer E&MISR to become nominated as a Competent Person to receive a safety document - Permit-for-Work.
• Work under a Permit-for-Work and lead team and or be member of a work party under safety document.
• Removal of Array Cable HV jumper cables - Pfisterer Seaanex 3a. (RAMS will be provided).
• Complete pre-use checks and inspection of 6.2m PASMA scaffold tower.
• Work from 6.2m PASMA scaffold tower.
• Erect cable containment from WTG tower to foundation where required.
• Route, clip and connect into HV dropper cable (Pfisterer Seaanex 3a connectors - RAMS will be provided) from WTG switchgear into inner array cable joints foundation.
• Disassemble 6.2m PASMA tower and stow as per site management instruction.
• Any other WTG related work scopes requested by Commissioning Lead Site Manager.
• Participate in regular offshore rescue drills through the project
Qualifications
• Completed an electrical apprenticeship, preferably as a cable jointer or HV technician.
• Certified in NKT CB 72-150 & CC 72-1250 T-boot terminations.
• Certified in Pfisterer Seaanex Type 3a Plug in operations.
• PASMA Towers for Users (T).
• All basic GWO training a
• Wind Turbine Safety Rules - Core.
Job Role
• Report directly to on shift Commissioning Lead Site Manager.
• Take technical direction from Electrical Safety Specialist where required.
• Work from COSV.
• HV cable pull, route and clipping - ad hoc.
• Connection of HV tower cable into junction box in tower (Pfisterer) - ad hoc.
• Termination of HV tower cable onto converter frame in nacelle - all WTG’s.
• Complete training in Employer E&MISR to become nominated as a Competent Person to receive a safety document - Permit-for-Work.
• Work under a Permit-for-Work and lead team and or be member of a work party under safety document.
• Removal of Array Cable HV jumper cables - Pfisterer Seaanex 3a. (RAMS will be provided).
• Complete pre-use checks and inspection of 6.2m PASMA scaffold tower.
• Work from 6.2m PASMA scaffold tower.
• Erect cable containment from WTG tower to foundation where required.
• Route, clip and connect into HV dropper cable (Pfisterer Seaanex 3a connectors - RAMS will be provided) from WTG switchgear into inner array cable joints foundation.
• Disassemble 6.2m PASMA tower and stow as per site management instruction.
• Any other WTG related work scopes requested by Commissioning Lead Site Manager.
• Participate in regular offshore rescue drills through the project
Qualifications
• Completed an electrical apprenticeship, preferably as a cable jointer or HV technician.
• Certified in NKT CB 72-150 & CC 72-1250 T-boot terminations.
• Certified in Pfisterer Seaanex Type 3a Plug in operations.
• PASMA Towers for Users (T).
• All basic GWO training a
• Wind Turbine Safety Rules - Core.
Applicants must have the legal right to work in the country where the role is based. Please note that we are unable to offer visa sponsorship.
Apply Now!
Similar Jobs
Onshore Logistics Manager
Offshore Wind
Project Quality Manager
Offshore Wind
Legal Corporate Secretary
Offshore Wind