A BESS, or battery energy storage system, stores electricity in batteries and releases it to the grid when it’s needed. BESS sites balance solar and wind output and earn from grid services, and LSP Renewables recruits the development, electrical, commissioning and controls teams that build them across the UK, Germany and APAC.
Key Takeaways
- A BESS combines battery cells, a battery management system, power conversion equipment, an energy management system and a grid connection with its own substation.
- Most new utility scale BESS sites use lithium iron phosphate (LFP) batteries housed in containerised enclosures.
- BESS sites earn by charging when power is cheap and exporting when it’s expensive, and by selling frequency response, balancing and capacity services.
- Scotland had 1,583 MW of operational battery storage and 3 GW under construction at the end of Q1 2026, according to Scottish Government figures reported by pv magazine.
- Building a BESS takes five core roles, covering development and grid, project management, HV design, commissioning, and SCADA and controls.
What a BESS Is
A BESS is a power station that stores energy instead of generating it. It charges from the grid or a co-located solar or wind farm, holds that energy in batteries, then discharges it back to the network in seconds when demand rises or supply drops.
That speed is what makes storage valuable. A battery can respond to a frequency drop faster than any conventional power station, fill the gap when the sun sets on a solar farm and absorb surplus wind that would otherwise be curtailed. As more of the grid runs on variable renewables, batteries do more of the balancing work that gas plants used to do.
What are the main components of a BESS?
A BESS has five main components, covering battery cells grouped into modules and racks, a battery management system (BMS), a power conversion system (PCS), an energy management system (EMS) and a grid connection. The cells store energy, the BMS protects them, the PCS converts DC to AC, and the EMS decides when to charge and discharge.
The site also needs transformers, switchgear, fire detection and suppression, HVAC to keep cells at the right temperature, and a substation that steps the voltage up to the connection point. On large sites that substation is a major workstream in its own right.
How does a BESS make money?
A BESS makes money by trading and by selling grid services. It buys power when prices are low and sells when they’re high, and it earns fees from the system operator for frequency response, balancing services and capacity market contracts that pay it to be available.
Most operators stack several of these revenue streams, and the EMS optimises between them in real time. That’s why software and controls engineers have become core hires for storage owners, not just electrical engineers.
Why BESS Is Growing So Fast
BESS is growing fast because solar and wind need flexible capacity alongside them, and batteries are the quickest flexible asset to build. A battery site can move from consent to energisation far faster than a pumped hydro or gas scheme, and it can share a grid connection with a solar farm.
Scotland shows the scale. At the end of Q1 2026 Scotland had 1,583 MW of battery storage operating and 3 GW under construction, against only 0.2 GW of solar being built, according to Scottish Government figures reported by pv magazine. Storage is now one of the busiest construction markets in renewables.
What is a co-located solar and BESS site?
A co-located solar and BESS site puts a battery next to a solar farm behind one shared grid connection. The battery stores daytime solar output and exports it later, which cuts curtailment and earns more per connection, but it also means both assets depend on the same substation and the same commissioning programme.
Shared connections make the grid design more complex. Engineers need to understand how transmission and distribution responsibilities divide at the connection point, because the export limit and protection scheme cover both the solar and the battery.
Is a BESS safe?
A modern BESS is designed to be safe through cell chemistry, monitoring and site layout. LFP cells are more thermally stable than older chemistries, the BMS shuts down faulty modules, and containers carry gas detection and suppression systems. Fire and rescue services are usually consulted on layout, spacing and water supply during planning.
The 5 Roles It Takes to Build a BESS
Five roles carry a BESS from a grid offer to commercial operation. The development and grid lead secures the site and connection, the project manager runs the build, the HV design engineer designs the electrical system, the commissioning engineer proves it, and the SCADA and controls engineer makes it trade.
What does a BESS development and grid connection manager do?
A BESS development and grid connection manager secures land, planning consent and a grid connection offer for a battery site. The role assesses network capacity, manages the DNO or NESO application, negotiates the offer and protects the queue position, which decides whether the project reaches construction at all.
What does a BESS project manager do?
A BESS project manager owns the build from ready to build through commissioning and handover. The role manages the battery supplier, EPC or balance of plant contractor, civils and HV works, runs the programme and budget, and coordinates the grid operator’s witness tests so the site energises on its contracted date.
Battery supply contracts shift a lot of risk between owner and supplier, so the PM needs to understand how risk is allocated in EPC and supply contracts for each delivery model.
What does a BESS electrical design engineer do?
A BESS electrical design engineer designs the site’s AC and DC electrical systems, from battery and PCS interconnection to transformers, switchgear, earthing and the substation. The design must meet the grid code and the network operator’s standards, so the engineer works closely with the grid connection manager and the protection team.
The substation is often the longest workstream, and clients that structure substation hiring early keep design and protection engineers on the programme when they’re needed.
What does a BESS commissioning engineer do?
A BESS commissioning engineer tests the battery, PCS, transformers, protection and controls before the site goes live. The engineer runs pre-commissioning checks, energises equipment in stages, proves the BMS and EMS functions, and supports G99 and grid code compliance tests witnessed by the network operator.
What does a BESS SCADA and controls engineer do?
A BESS SCADA and controls engineer builds and maintains the systems that monitor and control the site. The role integrates the BMS, PCS and EMS, sets up communications with the grid operator and trading platform, and keeps the site responding correctly to dispatch instructions after it goes live.
Storage is a core part of smart grid operation, where network operators use real-time data and automated control to match supply and demand.
How to Build a BESS Team
Building a BESS team works best when you hire in step with the project’s phases. The development and grid lead comes first, design follows the grid offer, the project manager joins before ready to build, and commissioning and controls engineers join ahead of energisation.
Step 1. Appoint a development and grid connection lead before you commit to land.
Step 2. Brief the HV design engineer once the grid offer sets the connection voltage and export limit.
Step 3. Hire the project manager before ready to build, so they shape the supply and EPC contracts.
Step 4. Book commissioning engineers against the energisation programme, with cover for witness test dates.
Step 5. Bring SCADA and controls engineers in before commissioning, so trading starts on day one.
Frequently Asked Questions
What does BESS stand for?
BESS stands for battery energy storage system. A BESS stores electricity in batteries, usually lithium iron phosphate cells on new utility scale sites, and releases it to the grid when it’s needed. It includes a battery management system, power conversion system, energy management system and its own grid connection.
How long does a BESS last?
A utility scale BESS is typically designed for a 15 to 20 year life, depending on cell chemistry, how hard it cycles and how well it’s maintained. Battery capacity fades over time, so many owners plan augmentation, adding or replacing modules partway through the asset’s life to keep the contracted output.
How big is a utility scale BESS?
A utility scale BESS usually ranges from tens of megawatts to several hundred megawatts, with storage duration measured in hours. Size is limited mainly by the grid connection capacity and the export limit in the connection offer. Larger sites need their own substation and transmission level connection.
What qualifications do you need to work in BESS?
Most BESS engineering roles need an electrical engineering degree or HNC/HND, plus HV experience for design and commissioning roles. Project managers need construction delivery and CDM 2015 experience, and controls engineers need SCADA and communications skills. Switching roles also need authorisation under the site’s safety rules.
What is the difference between a BESS and a solar farm?
A solar farm generates electricity from sunlight, while a BESS stores electricity and releases it later. A solar farm exports only when the sun shines, but a BESS can export at any time and respond to grid signals within seconds. Many new sites combine both behind one shared grid connection.
About the Author
Seth Hunt is Global Sales Director at LSP Renewables, where he leads client engagement across the company’s renewables desks. He has represented LSP at Global Offshore Wind 2026, the Scottish Green Energy Awards and the Floating Offshore Wind 2025 conference, and works alongside LSP’s delivery teams on senior recruitment mandates across solar, storage and wind.
Building a BESS team for your next site?
Talk to LSP’s energy storage recruitment team and we’ll find the development, HV, commissioning and controls engineers your battery project needs.